August 30, 2011
Water pours over the entire length of Vischer Ferry Dam on Tues, Aug. 30, 2011. The New York Power Authority is watching the Mohawk river dam for possible failure. Lock 7 is visible in the background.
August 30, 2011
Water pours over the entire length of Vischer Ferry Dam on Tues, Aug. 30, 2011. The New York Power Authority is watching the Mohawk river dam for possible failure. Lock 7 is visible in the background.
Comments
Use the comment form below to begin a discussion about this content.
Sign in to comment
Or login with:
OpenID